Building Work – Day Two
Posted: Wed 13 February, 2008 Filed under: Domestic, Getting Organised, House Work Leave a comment »By the end of Day One, the separating wall was down, all the tiles were off the walls, the shower-cubicle was gone, one of the doorways was blocked up, and the floor was patched-up where the wall had been.
Today, they’re going to be blocking up one of the windows, taking up the tiles on the floor, and a bundle of other things.
In short, the progress has been amazing. Well, to my mind it’s been amazing anyway. We’re really pleased with how things are going, and with the size of the merged room.
Yes, things are going well.