Up at the new house this week, there’s been a real parade of work going on.

By the end of today, the electrics will be all sorted – all the new lights, the new fuseboard, replaced switches, and fittings. The sockets have all been done, fitted properly into the walls. (instead of bizarre extension leads with double sockets on the end) There’s proper cable runs for things like the TV aerial cables so that it all goes in channels in the walls rather than being stapled to the walls. It looks smart.

The fireplace is gone – ripped out last Friday and blocked over – and the blockwork has been plastered over, ready for the wood-burning stove to go in next week. The various bits of wall where the electricians have been working have also been plastered over.

The fencing in the back garden is now done, and is all consistent, rather than suddenly changing from 6′ fence panels to manky plastic latticework. It feels more consistent, more complete, more ours.

The boiler has been serviced, and has been pronounced to be well, healthy, and OK despite not having been serviced for a good couple of years before now. (Another thing the fucking vendors lied about – and that’s a long list, believe me)

We’ve still got some radiators that need moving, and some plumbing odds and sods. We still need to finish off the floor tiles, too. That’s a job for this weekend, and probably next weekend too.

It’s not long now ’til we move in, but things are progressing nicely…