During the week, Herself has finished off tiling the walls in the redone kitchen – and bloody good they look too.

It’s taken longer than expected (and there’s still all the grouting to do) mainly because I don’t think either of us had really understood the sheer scope of the project. There’s one hell of a lot of tiles, and some decidedly awkward bits – not least the window-sill, and the wall where the sink is.

But it all looks fantastic – and once it’s done, I’m almost certain there’ll be a couple of photos put up here. Don’t hold your breath though, it won’t be ’til April…

In the meantime, this weekend will be spent doing the floor tiles. Still a big job – the tiles are the same beasts we’ve used in just about all the other rooms, 45cm square 10mm thick vitrified ceramic things that need a proper industrial tile-cutter. Yep, hired from HSS again – I suspect that over the length of the house project, we’d have actually been better off if we’d bought one, but there we go. That’s hindsight for you.

Still, by Monday we should be done on tiling – with the exception of the bloody grout, of course.  Just don’t expect much in the way of updates while we’re doing it.