Progress

Well, the bathroom refit is progressing. By the end of yesterday the entire bathroom had been stripped out, bath and basin gone, flooring gone, pipes redone, and the bath was installed. We’ve still got working water, and the rest of the bathroom is going to be done this morning, apparently.

Then this afternoon will be the “joy” of replacing the toilet. Apparently this “shouldn’t take too long”, and he may actually be finished by the end of today. I’m not fussed if he’s not and it goes into tomorrow, because I’ve already got it all sorted with work that I go back in on Thursday, but if he finishes today then I’ll be really impressed.


2 Comments on “Progress”

  1. Gert says:

    Work seems a long way to go for a slash and Thursday a long time to wait.

  2. Lyle says:

    Why go into work for a slash when you have a garden? *grin*


Leave a Reply

Your email address will not be published. Required fields are marked *